Apex Plaza
Cat A Office Fit out Design and Build
-
Full MEP isolations and removal within the ground floor Block A Building.
-
Installation of new mains containment incorporated into a main MEP bulkhead to allow for ductwork and Air conditioning pipework to be installed in a set space.
-
New Mitsubishi AC System installed along with a AE200-E Controller interlinked to the current building wide BMS
-
Crane lift for mechanical plant onto the roof was carried out taking consideration of the adjacent train overhead lines.
-
New primary ductwork installed to supply fresh air to the AC units all insulated with an aluminium wrap.
-
Mains containment feeding any services was installed with galvanised conduit for the lighting control, lighting and high level Power.
-
Lighting control system Simmtronic utilising day light dimming and emergency testing
-
New suspended LED luminaires were installed via a gripple suspension system and local Flex 7 connections
Value - £245,000
Bias - MEP