One Carey Lane

Refurbishment of 3rd and 5th floor Cat A, Toilets, Reception

  • Relocations of 4 pipe FCU’s and installation of new Barrell pipework.

  • Pipe Freeze on riser branches to floors to allow for new commissioning sets to be installed

  • Adaptations to Primary ductwork to allow for supply air to new FCU’s

  • Adaptations to all Secondary air ductwork and installation of new 1200 x 300 linear grilles within a SAS ceiling grid

  • Adaptations for Mechanical small power

  • Installation of new Hager Lighting Control system, new ceiling 1200 x 300 LED luminaires

  • New Cleaners Sockets power via floor grommets, Installation of new external lighting with Decking

  • Within the reception area a bespoke KNX control system fully integrated for Audio, Lighting, ventilation and Touch screen desk mounted tablet

Value -  £318,000 Traditional Build