Chailey School

Labour Only Full MEP Package

Full MEP comprised of the instillation of both domestic

and cat5 water services throughout the 3 story school

extension. Servicing the 12 new toilet blocks, science

suites and kitchen.

Instillation of steel heating pipework, air source heat

pump pipework, domestic services, over 75 rads and

soil and vent pipework to all the bathrooms, labs and

kitchens.

The instillation of a brand new plant room, inclusive of

water tanks, dosing pots, buffer vessels, heat

exchangers, circulations pumps and booster sets.

Electrically we installed all of the buildings small power

including sockets and classroom dados, plus air

source heat units, AHU’s and associated equipment

We facilitated the extension of the mains incoming

power by installing additional armoured cable supply

to the new floorspace

New suspended PIR LED luminaires were installed via

a gripple suspension system

Value -  £420,000

Bias - MEP