Cat B Office Fit Out Design and Build

  • Relocations of 4 pipe FCU’s and installation of new Barrell pipework.

  • Adaptations to Primary ductwork to allow for supply air to new FCU’s

  • Adaptations to all Secondary air ductwork and installation of new 1200 x 300 linear grilles within a SAS ceiling grid

  • Adaptations for Mechanical small power

  • Installation of new Hager Lighting Control system, new ceiling 600 x 600 LED panels

  • New Cleaners Sockets power via floor grommets, Installation of Kitchen power. Under floor busbar serving 3 compartment floor boxes

  • New Cat 6 Data installation throughout including high level WAP units

  • A new wall mounted AC unit within the newly formed Comms room

Value -  £211,000