F45 Glasgow

Gym Fit Out Design and Build

  • Installation of new VAM 100 Ventilation system to supply the gym floor and changing room areas with fresh air and extract, a new extract fan and ductwork installed within the gym floor.

  • New domestic services with a 500ltr hot water cylinder installed serving showers, toilets and sinks

  • New Containment through with galvanised conduits within the gym floor to service high level services lighting and power

  • New lighting system comprising of local switching and PIR sensors controlling suspended LED linear

  • Installation of a data network to feed all audio and visual items

Value -  £111,000

Bias - MEP